shiangshangph.com

Block 13 Lot 7 & 8 ,Mountview Industrial Complex II
Maguyam, Road Bancal ,Carmona, Cavite, Philippines.
(046) 430 – 1892
(046) 430 – 1895

Electronics Mfg. Co. Phils., Inc.

Energy Efficiency & Equipment Upgrade

Energy conservation is a key priority at Shiang Shang. We have invested in energy-efficient injection molding machines that consume significantly less electricity while delivering high productivity.

We also optimize our production schedules to run machines at optimal loads, reducing idle time and energy wastage. Our preventive maintenance program ensures that all equipment operates at peak efficiency, preventing unnecessary power usage caused by mechanical inefficiency.

Through these efforts, we contribute to lower greenhouse gas emissions and reduce the environmental impact of our operations while also controlling operating costs—creating value for both the business and the planet.

Leave a Reply

Your email address will not be published. Required fields are marked *